Product Roadmap

TekRamp's roadmap is aligned to FedRAMP's own milestones. We ship ahead of every deadline so you're never scrambling.

FedRAMP Milestones Driving Our Roadmap

End of June 2026
CR26 published
July 28, 2026
FedRAMP Ready retires
September 30, 2026
OSCAL packages required
December 16, 2026
Rev 5 Program Cert cutoff
Q3–Q4 2026
20x Phase 3 adoption
1

CR26 Readiness

Target: End of June 2026

When the Consolidated Rules of 2026 go live, TekRamp will speak the new language of FedRAMP from day one.

Certification Classes A–D

Full support for the new Certification Classes replacing impact levels, with backward-compatible labels during the transition period.

Rev 5 & 20x Dual-Path Support

Choose between Rev 5 (NIST 800-53 controls) or 20x (KSI outcome-based) authorization and manage either path from a single platform.

Key Security Indicator (KSI) Support

Manage, track, and map evidence to KSIs — the outcome-based requirements at the center of FedRAMP 20x compliance.

2

OSCAL Package Hardening

Target: September 30, 2026

By the OSCAL machine-readable deadline, every TekRamp export will validate cleanly against FedRAMP schemas with complete, submission-ready packages.

Full OSCAL Package Coverage

Complete OSCAL export across all FedRAMP document types — SSP, POA&M, SAP, SAR, and ConMon — with schema validation on every export.

Version-Stable Exports

Re-exporting a package preserves identifiers across versions, so agencies and FedRAMP PMO can track your submissions over time.

KSI Evidence Mapping

Link your existing evidence — vulnerability scans, configuration checks, manual uploads — directly to KSIs with pass/fail validation scoring.

3

Program Certification & Trust Center

Target: December 16, 2026

When the new authorization routes open, TekRamp will guide you through every gate — including the new sponsorless path.

Sponsorless Program Certification

Guided workflow for the new Rev 5 Program Certification path — no agency sponsor required. Readiness gates and pre-submission checklists keep you on track for the December 2026 cutoff.

Trust Center

A public trust center page for your authorization — current status, certification class, and assessment history — so agencies can verify your compliance posture at a glance.

20x Ongoing Authorization

Define and track security improvement goals for 20x packages, with progress reporting integrated into your continuous monitoring dashboard.

Already Shipping

Available today

These capabilities are live today and form the foundation everything above builds on.

OSCAL SSP & POA&M Export
Machine-readable packages with schema validation
Multi-Party Collaboration
Vendors, consultants, 3PAOs, and agencies on one platform
AI-Powered SSP Narratives
AI drafts control narratives from your architecture
Continuous Monitoring
Automated monthly ConMon packages and drift detection
AWS Evidence Integration
Automated collection from CloudTrail, Config, GuardDuty, Inspector
Inheritance Mapping
AWS GovCloud and Azure Gov shared responsibility templates

Want to See It in Action?

Request a demo and we'll walk you through our delivery timeline and how each milestone applies to your authorization path.